Purchased in October 2011 at Auction.
5 flats in a poor condition habitable, except flat 5 which was in a very poor state.
The flats were rented at the time for below a commercial rent. Refurbishment of each flat was undertaken to take 6 months in total.
No planning required.
Flats sold by 2013.